Moving Your Industry Manufacturing Forward We face each project as a new challenge and with our ability to build and innovate we overcome all barriers to using content. Email. praenergy1510@gmail.com Call. +919904316737 Leader in industrial Factory around the world We face each project as a new challenge and with our ability to build and innovate we overcome all barriers to using content. Email. praenergy1510@gmail.com Call. +919904316737
About US

We are work with Industries around the world since 1989.

 

In Inductive loads like Motors, Pumps and in mixed load conditions like buildings ( with pumps, ACs, water cooler and lighting load) , there is an increase in reactive load of the electricity system which leads to higher consumption due to lower efficiency and also poor Power factor leads to penalties and financial losses.  The bills for these services are very high and hence there is a need to reduce the consumption and save money.

Our Technology Provides real time control of all basic power system Parameters (transmission Voltage, impedance and Phase angle). By this it is possible to save electricity and reduce the electricity bill by 2 to 10% . Universal Power Flow Controller (UPFC), as a representative of State of the Art  semiconductor chipset  generation of MOSFET devices, this one is most comprehensive  device system steady-state it can implement power flow regulation, reasonably controlling line active power and reactive power, improving the actual load capacity of power system, and in power system transient state it can realize fast-acting reactive power compensation, dynamically supporting the voltage at the access point and improving system voltage stability, moreover, it can improve the damping of the system.

The main advantage of the UPFC is to control the active and reactive power flows in the Actual load line.

01
IMPROVES Power Factor as required by the authorities
02
Helps eliminate PF losses Penalties and thus saves money.
03
Increases life of cables/ Motors/Pumps/ starters, etc.
04
LEDs will indicate that which of the three phase supply is ON.
05
Reduces Line Current and Line losses
03
Reduces frequent maintenance of cables/ Motors/Pumps/ starters, etc.
03
Reduces the KWH (the units consummated from 2 to 8 % as per the load conditions)
05
Replaces high current consuming capacitors and hence saves electricity.
06
Eliminates Harmonics to the 2nd level and helps in safeguarding system.
04
Reduces Reactive load to a bare minimum, thereby reduces over load on the system.
07
Reduces I2 R Losses and Heat Losses which leads to better efficiency and hence saves money.
05
Reduces Maximum Demand load so saves money on excess demand load penalties to extent possible.
07
Helps to get rebate to the tune of 2.5- 7% based on state electrical regulatory commission laws on electricity bills from the service provider.
06
Reduces heat in cables.
04
Reduces KVA Demand.
00 +
Successful Installations
00 %
Efficiency
00 +
Number Of Happy Clients
00 k
Special Machinery
Services

Creative features from production industry

Success

image
Service Number: 15287

Location: Balashinor Municipality, Gujarat

Money saved : 1007831,     PF improved from 0.839 to 0.983

MD reduced from 174 to 143,  Reactive units reduced by 37734 units per month

Type: Water Works

Location: Balashinor Municipality, Gujarat

Money saved : 811944,     PF improved from 0.697 to 0.992

MD reduced from 107 to 55,  Reactive units reduced by 25515 units per month

Type: Water Works

Location: Dehgam Municipality, Gujarat

Money saved : 480000,     PF improved from 0.87 to 0.98

MD reduced from 206 to 170,  Reactive units reduced by 35000 units per month

Type: Water Works

Location: Mansa Municipality

Money saved : 1500000, MD  reduces by 46

PF improves from 0.656 to 0.99, Rate/unit reduces from Rs 8.31 to Rs 6.44

Type: Water Works

Location: Mansa Municipality

Money saved : 780000, MD  reduces by 42

PF improves from 0.85 to 0.98, Rate/unit reduces from Rs 6.72 to Rs 6.58

Type: Water Works

Location: Petlad Municipality

Money saved : 960000, Electricity Rate/unit reduces from Rs7.07 to Rs 6.33.

Maximum Demand reduces from 235 to 184 . Reactive units reduced by 57000 units.

PF improves from 0.808 to 0.996

Type: Water Works

Location: Nand

Effective reduction of 73 Paise per unit amounting to Rs 379444 per month

Type: Water Works

Location: Bhersam

5% consumption reduction observed and despite higher load, the MD has remained under control with no penalties. Units/MD has actually come down despite higher usage.

Type: Water Works

Location: Vilayat

11% savings observed. MD decreased by 11% and Current by 13%. Savings are about Rs 26500 per month.

Type: Water Works

Location: Saraswati old

10 % Current and 7.5% MD reduction and 12 Paisa/unit saving .  Effective savings of about 11% or Rs 81000 per month observed.

Type: Water Works

01

Analysis of the client's objectives & needs

Our approach to project management is grounded in practical experience and prioritises open communication.
02

Engineering project study & solution design

Together, we identify the industrial data automation project's general scope and the components needed to produce.
03

Solution execution phase and installation done

We collaborate closely on with you and examine the strategy and install and integrate the mechanical.
Useful For Industries like

Explore List Of Industries

0000
Success Projects

Get A Personalized Solution For Your Need!

Contact

Have a project in mind? Contact with us

There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form by injected humour.

PRA Energy Solutions

A- 801, SHUBH PIONEER, BEFORE KALPATARU SOCIETY, KOBA, GANDHINAGAR 382007

Email Address

Interested in working with us?
praenergy1510@gmail.com

Opening Hour

Mon - Fri: 09am - 07pm

Get in Touch

The point of using Lorem Ipsum is that it has more-or-less normal